Complete Bathroom Renovation Checklist
A successful bathroom renovation follows four key phases: Pre-Renovation (2-4 weeks planning, permits, design, quotes), Demolition Phase (3-5 days demo, waterproofing prep, asbestos check), Installation Phase (2-3 weeks tiling, plumbing, electrical, fixtures), and Finishing Touches (3-5 days painting, sealing, final inspection). Total timeline: 3-5 weeks. Critical checkpoints: AS 3740 waterproofing certification, licensed tradies for all plumbing/electrical, final inspection before handover. Costs: $15k-$30k mid-range.
Checklist Overview
Get 3-5 detailed quotes from licensed contractors. Check permits required (council/strata). Finalize design, fixtures, tile selections. Plan temporary bathroom access. Remove old fixtures, tiles, vanity safely. Check for asbestos (pre-1990s homes). Dispose of waste at licensed facility. Prepare substrate for waterproofing. Waterproofing + AS 3740 certification. Floor + wall tiling (7-10 days cure time). Plumbing rough-in, electrical, ventilation. Install vanity, toilet, shower, fixtures. Grout sealing (wait 48-72 hours cure). Painting, mirror, accessories installation. Final inspection + waterproofing sign-off. Deep clean before handover
Critical Success Factors
Never skip waterproofing certification - it's legally required in Australia. AS 3740 compliance prevents $10k-$30k water damage repairs. Only hire licensed plumbers and electricians (check licenses at servicensw.gov.au). Allow 48-72 hours cure time for tiles before grouting. Test all fixtures before final sign-off. Keep existing plumbing layout to save $3,500-$7,500. Add 15% contingency for hidden issues (common in pre-1990s homes).
Quote check
Compare itemised quotes for materials, labour, access, warranties and exclusions.
Local factors
Final pricing can vary by location, site access, compliance requirements and supplier availability.